PROJECTS
With over 30 years experience and extensive knowledge in all aspects of Shipbuilding and Custom Yacht construction and outfit, I can advise and guide you in every step of the process.
My mission is to deliver to my Client a thrilling Yachting experience from concept, design and building process through to Enjoyment.
I am passionate for the construction of yachts and ships, not just in seeing the successful launch but in exceeding the expectations of the Owners. To achieve a successful project, I bring an unrivalled technical expertise in Project Managing a construction and allied with my attention to detail, results in a cost-effective, efficient, above target solution.
- 2015 130m ++ New Construction Project management and design of Security System
- 2014 MY Madame GU AV and IT refit project.
- 2013 ABS- Yacht approval on behalf of Class and Flag .
- 2007-2012 Direction of projects for construction of 56m, 67m and 120m Yachts.
- 2010 Direction for the design of a 93m yacht to the new Passenger Yacht Code.
- 2007-2012 Directing production of a 74m Explorer and 76 m Luxury Yachts.
Owner’s Representative for a Warranty and Refit period for 126m Private Yacht.
- 2006-2007 MY Space, 45 m represented the Owners interests in all matters regarding the construction. Responsible for Owners Supply Items and verification commissioning at the Yard
- 2003-2006 MY Laurel, 73 m represented the Owners interests in all matters regarding the construction – commercial, technical and commissioning. Contracting and coordination of all OFE- Bridge Navigation Equipment, Audio Visual, Security, Computer, Fitness, Tools, Tenders and Hotel items. Liaised with Class and Flag state to achieve compliance.
- 2001-2002 MY Zenobia, 58 m Based in the yard verifying structure, insulation, fairing/paint, safety items, exterior/interior furniture, outfit etc. Attended the bi-monthly architectural meeting for technical aspects and chaired the weekly site meeting with A&R management.
- 1999-2001 P&O "Pride of Rotterdam" and "Pride of Hull" (60,600 grt) complete responsibility for hull, paint, insulation, and all hotel aspects of the two Ro-Pax New Builds.
- 1998-1999 Disney Cruise Line "Disney Wonder" "Disney Magic" (83,000 grt) Carried out class and statutory surveys, sea trials and docking. Inspected structural steel, piping, outfit and insulation for Owner approval, inspecting spaces prior to panelling in public areas, back of house and crew areas for all disciplines.
- 1995-1998 Safety inspections for "Dawn Princess" and Hull inspections for "Grand Princess" responsible for all hull inspections for the Largest Passenger ship built to date.
- Ship certification surveys for completion and delivery of "Carnival Destiny"